Stairs in Progress - Chelsea - New Wave

Social Media 47.jpg

A work in progress that we would like to highlight this month is a 5-story house located in Chelsea. After previous fruitful collaborations New Wave London Ltd and Smet Staircases teamed up again. But of all projects this had to be the most challenging one.

 

The brief was a 4-flight staircase with a continuous handrail from top to bottom, a cut string design and a contemporary feel to it. Not only that, but the first 2 flights had to be marble clad to give an even more luxurious feel to it.

 

The project is nearing completion now and we have to say that it looks absolutely magnificent. The staircases are made out of solid painted Beech and we added curved wreath pieces where the staircases turn to create smooth transitions. All of this is topped off with a steel balustrade that has a bronze finish applied on site.

 

We are already looking forward to the next project with New Wave London Ltd. Make sure you follow us on social media or subscribe to our newsletter if you would like to see updates on this or future projects.

Share this article on:

We are exhibiting at the Decorex International show!

From the 6th until the 9th of October, the Decorex International show is back, presenting next-level design, interior products, projects and perspectives from across the world. It features international brands and designers, each presenting their newest collections of exquisite furniture,...

Smet Staircases newsletter 14/06/2019

Have you seen our latest projects yet?

 

The Smet team is very proud to present two recently finished projects, starting with this Walton-on-Thames - F project.

Smet Staircases Newsletter 15/03/16

Antique bronze patinated wrought iron spindles, solid Black Americain Walnut and a personalised design that takes this hallway to another level. Our Iver model offers everything one should expect from a luxurious and bespoke staircase that perfectly fits the room it is designed for. A staircase...